Sovini Construction worked with One Vision Housing and industry professionals during the design stage of the new rain screen classing system and aluminium rail system to ensure a feasible, viable solution was installed to the existing high-rise buildings.
Upon instruction of the design and specification, Sovini Construction embarked on a 20 week project to install the new rain screen system along with new fire breaks, curtain walling and internal fire protection works.
In order to access the blocks, we designed a bespoke base of scaffold to the bottom floors and access to the upper floors using mast climbers
Sovini Construction are committed to supporting the communities we work in. To thank residents for their patience and cooperation during cladding refurbishment works, Sovini Construction held a carol concert in collaboration with Brunswick Community Centre.
All phases are now complete and meet current fire safety regulations by Building Control.